ASX Share Price
0.06
Code: HLX

Latest News

Tuesday 31st January 2012
Investor Presentation
Wednesday 19th October 2011
September 2011 Quarterly Report
Tuesday 20th September 2011
Helix Resources Annual Report 2011

Enquiry?

Click to email us with a question about Helix or our projects.

Subscribe

Add me to your mailing list

Click to email us and we will add you to our mailing list.

Subscribe

Reserves and Resources


Restdown JV Resource August 2011

(Helix 70%, Glencore  30%)

Restdown Prospect - Inferred
Domain Au Cut Off
Grade
Tonnes Au Grade
(g/t)
Contained Au (oz)
Sunrise 0.3 2,100,000 1.3 85,000
1.0 1,100,000 1.9 66,000
Good Friday 0.3 470,000 0.9 13,000
  1.0 80,000 1.6 4,000
         
Total 0.3 2,600,000 1.2 100,000
Total
1.0 1,200,000 1.8 70,000
Note: Discrepancies in table figures are due to rounding


Canbelego Copper Resource October 2010

(Helix 51%, earning 70% from Straits Resources)


The total copper resource for the Canbelego Copper Deposit at a 0.3% Cu cutoff is classified according to the JORC Code (2004) as:
JORC Category Million tonnes Grade % Cu Contained Tonnes
Inferred 1.5 1.2 18,000
TOTAL 1.5 1.2 18,000


Tunkillia Resource August 2009

(Munga Goldmines Ltd 55% , Helix 45%)


The total oxide gold resource for Area 223 at a 0.5g/t Au cutoff is classified according to the JORC code (2004) as:
JORC Category Million tonnes Grade g/t Au Ounces
Measured 
1.2 1.8 66,000
Indicated 2.0 1.3 86,000
Inferred 2.5 1.0 
77,000
TOTAL 5.7 1.3 230,000
                      
The total primary gold resource for Area 223 at a 1.0g/t Au cutoff to an approximate depth of 200 metres below ground level is classified according to the JORC code (2004) as:
JORC Category Million tonnes Grade g/t Au
Ounces
Indicated 4.2 2.0
270,000
Inferred 4.4 2.1 300,000
TOTAL 8.6 2.1 570,000

Within the primary zone, silver is associated with gold in the approximate ratio 3:1 The silver resource for primary zone blocks with cutoff grade 1.0g/t Au and based on unrestricted gold with an inverse distance power of 1 is:
JORC Category Million Tonnes Grade g/t Ag Ounces
Indicated 4.2 5.7 770,000
Inferred 4.4 5.7 810,000
TOTAL 8.6 5.7 1,600,000

Mungana Gold Mines Ltd [ASX code: MUX] purchased Minotaur Ventures Pty Ltd, the Tunkillia JV Manager and 55% equity holder in January 2012. 
The JV has approved a $3M exploration budget for 2012 and Mungana has said it wants the Project to be production ready in 2014 with initial scope for a conventional open-pit operation and 2Mtpa CIP plant. 
Helix has elected to dilute with our equity position expected to be around 35% at the end of the 2012 program spend.


Yalleen JV Resource* – April 2009

(*Helix maintains 30% interest in Iron Ore)

Table A: Yalleen Project April 2009 Inferred and Indicated Mineral Resource
Deposit Tonnes Fe SiO2 Al2O3 P S LOI Mn MgO
  MT % % % % % % % %
Kumina Creek Deposit
Indicated 34.96 57.53 5.18 3.70 0.060 0.015 8.24 0.06 0.11
Inferred 23.61 57.53 5.19 3.77 0.060 0.015 8.15 0.07 0.11
Total 58.57 57.53 5.18 3.73 0.060 0.15 8.20 0.06 0.11
                   
Robe Exit Deposit
Indicated 12.91 56.50 5.52 3.74 0.053 0.018 9.41 0.05 0.14
Inferred 12.82 56.32 5.45 3.89 0.064 0.016 9.31 0.03 0.11
Total 25.73 56.41 5.49 3.81 0.058 0.017 9.36 0.04 0.12
                   
Total Resource - CID
Indicated 47.87 57.25 5.27 3.71 0.058 0.016 8.56 0.06 0.12
Inferred 36.43 57.10 5.28 3.81 0.061 0.015 8.56 0.06 0.11
Total 84.30 57.19 5.28 3.75 0.060 0.016 8.56 0.06 0.11

The information in this report that relates to Resource estimations is based on information compiled by Mr M Wilson who is a full time employee of Helix Resources Limited and a Member of The Australasian Institute of Mining and Metallurgy. Mr M Wilson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr M Wilson consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.